Lemler lane or 25 1/2 Ave Has been re-opened 6-9-21.

Scott Walters, the town patrolman has reopened 25 1/2 Ave near Duke Dahl’s old house west of fire number  2935. The road’s culvert has been replaced.  Section of road that is gravel will be covered in asphalt after it settles.

Posted in